Construction methods of PE pipes in drainage engineering
Release time:
2024-07-01
PE pipes are mainly divided into two types of construction methods in municipal water supply and drainage engineering: slotting and non excavation.
- When carrying out construction, attention should be paid to the specifications of pipeline laying according to relevant regulations, and inspection should be carried out according to product standards to remove pipes that do not meet the standards. If the pipeline is laid under the roadway, the thickness of the soil covering the top of the pipeline should not be less than 0.7 meters. If it is necessary to cross obstacles, protective sleeves made of steel bars or other materials should be installed. When laying pipelines, they should be constructed in a straight line. If flexible interface folding is required for laying, the vertical axis angle of the connected pipelines should not exceed 2 °. When the burial depth of the pipeline is lower than the bottom surface of the building's foundation, the pipeline should not be laid within the range of the foundation diffusion angle compression zone under the building's foundation. In areas where the groundwater level is higher than the elevation of the excavation trench bottom, measures should be taken to lower the groundwater level during construction to prevent instability of the trench. During the entire installation and backfilling process, attention should be paid to the absence of water accumulation at the trench bottom or freezing of the soaking trench.
- According to the external pressure situation, it is advisable to choose PE pipes with different stiffness.
- When excavating the trench, the bottom width of the PE pipeline trench should be reasonably determined to comply with construction regulations for manual operation. During the construction process, it is not allowed to over excavate the trench. If over excavation is accidentally carried out, natural graded sand and stone materials should be used for landfill. The particle size of the buried sand and stone should be between 10mm and 15mm, or the larger particle size should be less than 40mm.
4. When carrying out the installation of the lower pipe, strict inspections should be carried out on the groove width, groove depth, foundation surface elevation, inspection wells, and other aspects after slotting to ensure that the work items meet the construction requirements and regulations before proceeding to the next step of the process, in order to improve the construction quality.
Shanghai Zhongze Yi Metal Materials Co., Ltd. specializes in steel products. We have a professional production and processing factory, a complete quality assurance system, and our integrity, strength, and product quality have been recognized by the industry. Welcome friends from all walks of life to visit, guide, and negotiate business. Since the establishment of the company, it has been deeply supported and trusted by a large number of customers! With the continuous expansion of production scale, the company is gradually expanding into domestic and international markets, accepting various types of orders. Our company will continue to adopt a rigorous and pragmatic attitude, fully leveraging our advantages in equipment, technology, management, services, and other aspects.